Wastewater treatment plants
Power for aeration. Heat for the sludge. Biochar for the digester.
Aeration is the largest power consumer of a treatment plant, and drying or heating sludge needs heat all year. A FLOYD plant supplies both on site – from woody green waste your municipality collects anyway – and adds biochar for the digester.
Your challenge
- Aeration blowers drive a high power bill
- Heat for digesters and sludge drying, often from a fossil boiler
- Woody green waste that is unsuitable for digestion
Your solution
- Rule of thumb: one F60 TC per about 20,000 population equivalents
- Heat for sludge drying: one unit evaporates about 1,300 t of water a year
- Biochar for the digester and CO₂ certificates – FLOYD handles certification and sale
What one unit delivers in a year
- ≈ 650 MWhelectricity – about 180 households (3,500 kWh each)
- ≈ 1,300 MWhheat – energy content of about 130,000 litres of heating oil
- ≈ 25 tbiochar – a carbon sink
One F60 TC unit at full load for 8,200 hours. Your actual figures depend on your demand.
How big is the project? How much work is the plant?
Smaller than you think – on both counts.
The project
1 week
Installed and commissioned within one week. FLOYD delivers everything from one hand – plant, building, bunker, conveying and connections.
- Planning and permits – FLOYD prepares everything
- Delivery of prefabricated modules
- Installation and commissioning in one week
Day-to-day operation
< 2 h per week for you
You
- Weekly check – about 30 minutes
- Order wood chips – about 1 hour a week
- Change the biochar container when full
FLOYD
- 24/7 remote monitoring
- Engine oil change every 1,800 h – about 4–5 times a year
- Gasifier service every 2,500–2,800 h – about 3 times a year
0 h of work for you
You
- Use the electricity and heat
FLOYD
- 24/7 remote monitoring
- Weekly check
- All services and repairs
- Biochar container change
- Wood-chip logistics on request
How often the biochar container is changed
- about dailyBig bag (1 m³)
- about every 9 daysSmall skip (~7 m³)
- about every 3–4 weeksLarge container (~20 m³)
One unit, about 3 kg of biochar per hour, continuous operation. The container size is chosen with you.
Six connections – that is all the plant needs
- Wood chips in
- Hot water out and return in
- Grid connection
- Compressed air
- Biochar out
- Exhaust pipe (100 mm, no chimney)
See it for yourself
Our reference plant in Griffen has been running around the clock for more than 16 months and makes our own site self-sufficient. Visit it, look at the live data – or join us on a service day.
Arrange a visitFLOYD is always there
A power plant is only as good as the people behind it. Every FLOYD plant is connected to our control centre. We see what your plant does – day and night – and react quickly, remotely or on site.
- >90 %availability
- >8,000 hoperating hours a year
- 24/7remote monitoring
- 1contact for everything
The carefree package
Want no work at all? FLOYD runs and maintains the plant for you. You get the energy – we take care of the rest.
Calculate with the carefree packageWhat our customers say
By using our wood residuals internally and efficiently, we cover a large share of our commercial electricity demand and also feed the heat we generate into our own local heating network.
Alois AbergerOwner and managing director, Thermoholz AbergerWeißbach bei Lofer, AustriaWe operate and maintain the plant ourselves – that only works if you have a reliable partner in the background. At FLOYD BioEnergy, response times are short and the work is solution-oriented. The plant runs stably and reliably and is an ideal addition to our core business.
Translated from German
Simon BiedermannManaging director, Baumwerker AG / Stromwerker AGRheinklingen, SwitzerlandThe CHP was new territory for us, and we had to learn its operation and maintenance step by step. FLOYD BioEnergy was a reliable, patient and solution-oriented partner, always working to optimise the product for our application. Today the CHP runs stably and we operate it largely on our own. The resulting stable energy costs are of the utmost importance to our business at a time of uncertainty on the oil market.
Translated from German
Questions we hear from you
I am not an engineer. Can I run this?
Yes. The plant runs fully automatically. FLOYD monitors it around the clock and handles maintenance. With the carefree package we also operate it for you.
Where do I get the wood?
Any supplier of wood chips will do – or your own residues. The chips need max. 15 % water content; the plant can dry them with its own heat.
Can I see a plant running?
Yes. Our reference plant in Griffen, Austria has been running continuously for more than 16 months and supplies our entire facility with power and heat. We share its operating data, and you are welcome to visit – or to join us for a service day and see the maintenance yourself.