From one container to a power plant

Every plant is designed around your fuel, your site and your energy demand. Fuel intake, drying, screening, storage, the CHP units and biochar collection come from one group – FLOYD BioEnergy and our sister company BE&E.

Everything from one source – from wood chip to kilowatt-hour and biochar

Within FLOYD Holdings, material handling from BE&E and VibraPro meets the CHP and control technology of FLOYD BioEnergy. Together we plan and build complete plants – with one contract, one point of contact and no interface risk between suppliers.

  1. BE&E · VibraPro

    Material preparation

    Truck receiving, chipping, screening with disc and vibratory screens, belt drying of green chips to 10 % water content.

  2. BE&E · VibraPro

    Transport and storage

    Dust-tight SMART drag-chain conveyors, vibratory conveyors, moving floors, silos and buffer bins that feed every unit automatically.

  3. FLOYD BioEnergy

    Energy conversion

    F60 TC wood-gas CHP units: gasification, hot-gas filtration, engine and generator, heat recovery.

  4. FLOYD BioEnergy

    Control and monitoring

    One plant control system manages conveying, drying, CHP units and energy flows – with live SCADA and remote service.

  5. FLOYD BioEnergy · BE&E

    Biochar handling

    Automatic discharge, central collection screws, biochar bins and loading – ready for sale or certification.

Complete plant: intake, dryer, BE&E conveyors and four F60 TC units

2 × F60 TC

Turnkey two-unit plant

Two units in a compact building next to a fuel bunker with a rotating discharge. Chips are drawn from the bunker and conveyed directly to the units. The complete plant fits on the footprint of a small workshop and can be extended later.

Electrical output
160 kW
Thermal output
316 kW
Wood chips
approx. 3 t per day
Fuel storage
bunker with automatic discharge

4 × F60 TC

Four-unit plant with BE&E material handling

The standard turnkey plant for green chips. Fresh chips with up to 50 % water content are dried with the plants’ own heat to 10 %, screened and buffered before SMART conveyors from BE&E feed every unit. Without a dryer, the same layout runs on dry chips.

Electrical output
320 kW
Thermal output
632 kW
Drying
belt dryer, 50 % → 10 % moisture
Conveying
BE&E SMART Conveyor, dust-tight

13 × F60 TC

1 MW power plant

From truck to power, heat and biochar on about 2,000 m². Green chips are received, dried, screened and stored in silos; overhead chain conveyors charge two rows of units, and the biochar drops into central collection bins. Units are serviced one at a time while the plant keeps running.

Electrical output
1,040 kW peak
Thermal output
2,054 kW
Fuel
0.81 t/h at peak load
Drying
4 × 250 kg/h belt dryers, 50 % → 10 %
Storage
6 × 82 m³ chip silos, 2 × 30 m³ biochar bins
Footprint
approx. 2,000 m²

Buildings for one to four units

Steel and panel module

Steel and panel module

Steel-framed, insulated-panel building, made in Kentucky and shipped flat-pack, ready to assemble. One footprint of 160 m² houses one to four units.

Prefabricated concrete container

Prefabricated concrete container

Built off-site and delivered complete by heavy transport. Lifted onto a foundation – almost no construction work on site.

Already have a suitable hall? Then we install the units in your building – the calculator lets you compare both options. Start the calculator